Installation, Testing and Commissioning at Likhu 4 Hydro Electric Project (52.4 MW)

Owner Voith Hydro
Category Hydropower
Project type Erection & Installation – Electro Mechanical Works
Location Ragani,Pokli (Okhaldhunga) Saibu,Bijulikot,Naga Daha,Tilpung (Ramechhap)
Status Completed
Capacity 52.4 MW

Description

Likhu 4 Hydropower Project is a Run of River (ROR) type project being constructed at Limti, Okhaldhunga with the capacity of 52.4 MW. It has two units each of 26.2 MW. The source of River is Likhu Khola is glacier from the Southern Likhu Chuli and flows down to Koshi river along the border of Ramechhap and Okhaldhunga.


Jade Infra is responsible for erection and commissioning of all EM works at Likhu IV Hydropower. The Project consists of the two Units, each unit of 26.2 MW. The design rated discharge for the unit is 13.29 m^3/ sec with the maximum discharge of 14.32 m^3/sec. Each Unit consists of Generator (Set of Stator and Rotor) to be assembled at Site. The EM work started in 2019.

for inquiry you can contact us right away!!