Installation, Testing and Commissioning at Raswuagadi Hydro Electric Project (111MW)

Owner Voith Hydro
Category Hydropower
Project type Erection & Installation – Electro Mechanical Works
Location Rasuwagadi, Timure-5, Rasuwa
Status Ongoing

Description

Jade infra is responsible for the erection and Commissioning of all the EM Works at RHEP. The project consists of 3 Units, each of 37 MW and 3 generators, stator, and rotor to be fabricated at the site itself. The EM works started in 2018. The work completed to date is the installation of Draft Tube, Installation and Commissioning of 100/ 10 T EOT Crane, installation of Spiral cases, cooling water pump and pipeline, header tank. Moreover, the construction of the generator (Stator) for Unit # 3 is also currently being done with 50% of its work completed. Apart from this, all 10 transformers (including the spare) have been kept in this respective position in the transformer carven, 70% cable tray works have been accomplished. Furthermore, all the heating exchangers for cooling water pipeline system has been placed in the respective position inside draft tube

for inquiry you can contact us right away!!

Contact us